Footy Ferret

Updated

Aparecidense U20 v Planalto EC U20: power ratings compared

Aparecidense U20 are rated 0.062 higher than Planalto EC U20: against the same opponent, their goals scored over conceded is about 6% better than Planalto EC U20’s. Updated UTC

Power ratings

both rated among under-20 men’s clubs
Power ratings, Aparecidense U20 and Planalto EC U20
Aparecidense U20Planalto EC U20
−0.629Power ratinghigher is better−0.691
−0.285Attackhigher scores more−0.286
−0.344Defencehigher concedes less−0.405
232of 431Rankon its scale and in its age group256of 431
78Matches behind it31

Aparecidense U20 higher by 0.062 on the power rating: +0.001 in attack and +0.061 in defence. Against the same opponent, their goals scored over conceded is about 6% better than Planalto EC U20’s.

Leagues and form

last six results we hold, newest first

Aparecidense U20Form, oldest first: WLLLWL

  1. L1–2at Goiania U2031 Oct
  2. W3–1v Goiania U2024 Oct
  3. L0–2v Trindade U2010 Oct
  4. L0–2at Goias U203 Oct
  5. L1–3v Guanabara City U2025 Sept
  6. W3–0v Sao Luiz GO U2012 Sept

Planalto EC U20Form, oldest first: DLDLLL

  1. L2–3v Atletico Goianiense U2017 Oct
  2. L0–3v Guanabara City U203 Oct
  3. L0–2at Goiania U2026 Sept
  4. D2–2v Goias U2014 Sept
  5. L0–2at Cerrado U205 Sept
  6. D2–2at Anapolis U2031 Aug
MeetingsAparecidense U20 0, draws 0, Planalto EC U20 1: 1 meeting in the results we hold, newest first
DateMatchRating before
7 AugFTAparecidense U200Planalto EC U201Copa Goias Under-20−0.60
−0.80

Compare other teams

a name or part of one

How to read it

Power ratings are goals on a log scale against an average side: attack, higher scores more; defence, higher concedes less; the rating is the two added. A rating gap g means that, against the same opponent, the stronger side’s goals scored over goals conceded is about e to the power g times the other’s (0.1 is about 10% better). Ratings compare only within a scale: men’s clubs, women’s clubs and national teams each have their own. A rating built on fewer than 10 matches is provisional.

How these numbers are madeCoverage and speed